PETER SHAUGHNESSY
FINE CRAFT SCULPTURAL BOXES
 

Back

Specs Foundation Framing Roofing Exterior Interior Power, telephone and water Moving day

This is a section of the 1000' of trenching required to bring in the water supply.
The trench was dug to a depth of approximately  five feet to get below the frost line.

Water, power and telephone in the same
excavation for the last 85 meters to the studio

Edwards Powerline doing their thing

Installation of telephone line extension